5/5 2025-04-14Frequently Asked QuestionsHow long does it take to make the Rain dress?The Rain is handcrafted in 1014 weeks in our European atelier, with express options available.Can I customise this wedding dress?Yes change the neckline, sleeves, back style, fabric, colour, and train length at no extra cost
Alternatively, place all in a jar, close shut and shake very well to emulsify.Serve over grilled fish, seafood, grilled or steamed vegetables, greens, etc
Fabric: 100% polyester, 100% viscose lining
Cascading ruffles create dramatic volume and movement in the full-length skirt, adding romantic texture to this statement piece
Last Trail Before the Veil Hiking Bach For the outdoorsy bride who would rather summit something than sit in a bar